mrsllka.blogg.se

Government assistance dredging a small channel
Government assistance dredging a small channel










government assistance dredging a small channel government assistance dredging a small channel

The magnitude of construction is expected to be $1 Million to $5 Million.Applications are evaluated on technical merit, innovation and impact, the project plan, and the project team and resources.įederal (Department of Transportation, Maritime Administration: MARAD)įederal Ship Financing Program (Title XI) All in-water work must be completed by 15 February 2024. Dredging may commence after 16 July 2023 and after award. In-water work window starts 16 July 2023 and ends 15 February 2024. Marine conditions are subject to winter storms that hit this location. Neah Bay is near the outer coast of Washington with an outer breakwater for wave protection within the Bay itself. The dredging areas are exposed to strong and severe marine conditions. This performance window is during the most challenging storm season with difficult marine conditions. It is anticipated the work would be performed in the Fall-Winter of 2023-2024.

government assistance dredging a small channel

Placement of dredged material from the channel will be placed along the shoreline of Neah Bay. The material being dredged is native material that has not been dredged previously. The volume of sediment to be dredged from the channel is approximately 41,000 Cubic Yards (CY) within the proposed channel footprint. Army Corps of Engineers (USACE), Seattle District requires hydraulic pipeline dredging of a navigation channel at the entrance to Neah Bay, Washington. Feedback (including questions/concerns) is welcome NO LATER THAN 3/14 at 12PM, PDT.Review the questions in the link and respond, accordingly.USACE ARE IN URGENT NEED OF SMALL BUSINESS RESPONSES (NOT PROPOSALS). Sources Sought regarding this Neah Bay, WA requirement:












Government assistance dredging a small channel